I currently have 4 VMs set up in a server/runtime resource config; 2 machines for a test environment and 2 for a production environment. One of the machines (the test runtime resource) is handling dates natively in Blue Prism as MM/dd/yyyy while all other machines use dd/MM/yyyy.
As an example, if I perform AddDays(01/03/2020,1) on 3 of the machines and the result is 02/03/2020 as expected, but on this one machine, I get 01/04/2020. If I use the date picker in the Evaluate Expression window to pick the 1st of March 2020 on that machine the field is filled with 03/01/2020.
The regional settings of the machine are set to dd/MM/yyyy and all other regional settings match the production runtime VM, but the problem persists.
Any ideas?
As an example, if I perform AddDays(01/03/2020,1) on 3 of the machines and the result is 02/03/2020 as expected, but on this one machine, I get 01/04/2020. If I use the date picker in the Evaluate Expression window to pick the 1st of March 2020 on that machine the field is filled with 03/01/2020.
The regional settings of the machine are set to dd/MM/yyyy and all other regional settings match the production runtime VM, but the problem persists.